I started to work on "Summer
is Too Short" this week. My editing went well and I am hopeful I will
get this done soon.
I shot "Summer is
Too Short" last year, but
hadn't cut it together yet. It is a time lapse movie. I shot one image a day
for about 9 months, which gave me about 280 images.
I didn't have a time lapse video camera, so I used a still
camera. About a third of the way through, my still camera stopped working. I
borrowed my wife's camera for the rest of the movie.
I hand held the camera, so the images jump around quite a
lot. I expected this, but since I had to deal with a similar problem with "Contingency" (https://www.youtube.com/watch?v=79sPbUoD9zM),
I felt confident that I could work around it.
I use Premiere Pro to edit the movie. I imported all the
images and added them to a time line. The process I followed to line up the
images was to over lay one image on either the previous or following image. I
made the top image semi transparent. I used the motion controls to get the
images to line up.
The adjustments were rather tricky, but I got better at it
as I did more. I found it more difficult to deal with images that were at a different
angle. Again, I have gotten better at
that kind of adjustment.
I am about half way through aligning the images, so I think
I'll have that done next week. However, some of the images will need some
colour or brightness adjustments once I have them aligned.
This post is a mirror from my main blog http://www.dynamiclethargyfilms.ca/blog
No comments:
Post a Comment