Work on "The
Barrier" went fairly smoothly this week.
I finished adding the computer screens to the scenes that
needed them. That took much of the time. I had to go back and create some more
screen images.
There were a bunch of other scenes where I fixed some video glitches.
I'm not sure what caused them, because not all of the scenes had them and a few
had more than one. In all but one case, there was just a single frame that was
messed up. In the other case there were two frames. That made it easier to fix.
I just copied the frame after and overlay it to cover up the frame with the
glitch.
I started to compile the scenes into sequences. When I have
all the sequences done, I'll compile them into the full movie. I have the first
four sequences done and have five more to do. I did the fifth one too, but
forgot to do something, so will need to redo it.
I had planned to just do the images for this version of the
movie (version 0.2), but decided to do a few of the sound effects I had planned
to do. Mostly phones ringing. I'll leave the bulk of the sound work to the next
version (version 0.3).
I should have this version of the movie done this week. I
plan to show it to my wife when I'm done. If she likes it, I'll start on the
next version.